Skip to main content
Tallymark
Check my facility

State sheet · AZ

Tier II reporting requirements in Arizona

Deadline
1 March, yearly
Takes our file
No
Own thresholds
No — local rules vary
Fee
$75 then $20
Filing route read
2026-09-11
See if my site has to file

Free. No account, no email.

How Arizona takes it

Arizona takes Tier II through the state’s own myDEQ portal, where you key the data in. Our answer is the worksheet you type from.

This state does not take the file. Our answer works as the worksheet you type from, with the rule behind every number.

The filing is due 1 March each year and covers the calendar year before it. Filing with Arizona closes the state’s side only. Whether your local committee and fire department also get it is up to your county — ask them, and post each a copy if they do not take the electronic filing.

Before you send it — what else Arizona asks for

Arizona asks for more than the numbers: myDEQ has you upload safety data sheets, a site map and a Facility Emergency Response Plan as you go. The site map is not optional: Arizona says it is now mandatory for every facility. Gather those before you start. Whether you also post copies locally depends on your own jurisdiction: ADEQ runs Electronic Agreements, and if the agency with jurisdiction over your site has signed one you do not mail or email them a copy — if it has not, you do. Two local twists to check. A site on Gila River Indian Community land still has to post hard copies to the GRIC Office of Emergency Management even though it files online. And the Town of Gilbert runs its own fire regulation whose triggers are far below the state’s, so a Gilbert site can owe a filing on chemicals that are nowhere near a Tier II threshold — though a site reporting only those is exempt from the state filing fee. The fee itself is $75 for your first facility report and $20 for each additional one, capped at $500 a year.

Does Arizona set its own limits?

Arizona itself follows the federal thresholds. A city or county inside it may be stricter, and that is decided locally.

Arizona uses the federal thresholds, so the state answer is the federal answer. The difference is where your site sits. The Town of Gilbert runs its own fire regulation with triggers far below the state’s, and Gilbert sites report those chemicals through the same Arizona system even when they are nowhere near a Tier II threshold — with the small consolation that a site reporting only those pays no state filing fee. If your site is in Gilbert, ask the fire department what its list is; we do not hold it.

The words we read

ADEQ, AZSERC Tier II reporting page (azdeq.gov), read 2026-09-11 through the Internet Archive snapshot dated 2025-08-15 (the live site refuses our requests with HTTP 403 and we do not work around that, so this is the page as of that date). Arizona keeps the federal numbers: “For above-ground storage tanks and non-retail USTs, the threshold level for reporting is 10,000 pounds. For gasoline at a retail gas station, the threshold level is 75,000 gallons (all grades combined).” What differs is local: “Facilities filing in the Town of Gilbert should be aware that Gilbert has its own Fire Department Regulation for reporting chemicals, and those reporting quantity triggers are much lower than what the State mandates as a Tier II chemical. Though these particular chemicals may not constitute a Tier II report, the Town of Gilbert Fire Department requires its facilities to use the Arizona Tier II Reporting System to manage these chemicals.”

Where we read this

If something here is wrong, the checker has a way to tell us on every answer screen. We would rather be corrected than confident.

Find out whether you have to file

Tell us what you keep on site and we work it out against the federal list and Arizona’s own rules, showing the regulation behind every number.

Check my facility

Free. No account, no email.